View Source ExOAPI.Stripe.Schemas.QuotesResourceSubscriptionData (exoapi_stripe v0.1.4)
:effective_date :: :integer
When creating a new subscription, the date of which the subscription schedule will start after the quote is accepted. This date is ignored if it is in the past when the quote is accepted. Measured in seconds since the Unix epoch.
:trial_period_days :: :integer
Integer representing the number of trial period days before the customer is charged for the first time.
Link to this section Summary
Link to this section Types
@type params() :: map()
Link to this section Functions
@spec changeset(t(), params()) :: Ecto.Changeset.t()